Tanama River Pipeline By-Pass

  1. Home
  2. Infrastructure
  3. Tanama Pipeline Bypass

Project Details


 

Client: PRASA

Designer:  JAMA

Cost: $860,000

Manager: CH Caribe

Year Completed: 2014

This project consisted on the construction of the construction of a by-pass Force Main under the Tanama River, serving 60,000 clients in three municipalities.

Challenges


 

→ Installation of 2 parallel lines, 24″ Ductile Iron Force Main Lines.

→ Installation of Valves, MH, Air Vents, Drains, etc.

→ Work included River Deviation through a By-Pass Channel, and installation of pipeline Under the River with concrete encasement.

 